US Bridges

Harvey Road T-415 over Doubling Gap Creek

Good

Cumberland County, Pennsylvania · 550 Ft W of SR 233 · Structure no. 000000000068324

Built
2020
5 years old
Condition
Good
inspected June 2023
Type
Frame
Concrete
Length
30 ft
1 main span
Daily traffic
100
2018 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Harvey Road T-415 over Doubling Gap Creek is a concrete frame carrying Harvey Road T-415 over Doubling Gap Creek in Cumberland County, Pennsylvania. It was built in 2020, so it is 5 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 5% of them trucks, projected to reach 140 by 2038. The structure is 30 ft (9.1 m) long and 24 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesHarvey Road T-415
CrossesDoubling Gap Creek
Location550 Ft W of SR 233
RouteCity Street 0
Coordinates40.23234, -77.43988
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73 US tons
Inventory rating44 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length30 ft (9.1 m)
Longest span30 ft (9.1 m)
Deck width24 ft (7.3 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2018)
Projected traffic140 by 2038
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Harvey Road T-415 over Doubling Gap Creek built?

It was built in 2020, making it 5 years old in 2025.

What condition is Harvey Road T-415 over Doubling Gap Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Harvey Road T-415 over Doubling Gap Creek carry?

About 100 vehicles per day (2018 count), of which roughly 5% are trucks.

How long is Harvey Road T-415 over Doubling Gap Creek?

The structure is 30 ft (9.1 m) long with a longest span of 30 ft (9.1 m) and a deck 24 ft wide.

Who owns Harvey Road T-415 over Doubling Gap Creek?

It is owned by the Town or Township Highway Agency.