US Bridges

I 80 EB over SR 4009

Good

Columbia County, Pennsylvania · Bloomsburg · Structure no. 000000000045785

Built
2009
16 years old
Condition
Good
inspected February 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
67 ft
1 main span
Daily traffic
14,993
2024 count
Owner
State
State Highway Agency

About this bridge

I 80 EB over SR 4009 is a prestressed concrete box beam or girders - multiple carrying I 80 EB over SR 4009 in Columbia County, Pennsylvania. It was built in 2009, so it is 16 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 14,993 vehicles a day, roughly 35% of them trucks, projected to reach 30,726 by 2032. The structure is 67 ft (20.4 m) long and 51 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI 80 EB
CrossesSR 4009
LocationBloomsburg
RouteInterstate 80
Coordinates41.02007, -76.47105
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionFebruary 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73 US tons
Inventory rating51 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length67 ft (20.4 m)
Longest span65 ft (19.8 m)
Deck width51 ft (15.4 m)
Roadway width47 ft (14.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,993 (2024)
Projected traffic30,726 by 2032
Trucks35%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I 80 EB over SR 4009 built?

It was built in 2009, making it 16 years old in 2025.

What condition is I 80 EB over SR 4009 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does I 80 EB over SR 4009 carry?

About 14,993 vehicles per day (2024 count), of which roughly 35% are trucks.

How long is I 80 EB over SR 4009?

The structure is 67 ft (20.4 m) long with a longest span of 65 ft (19.8 m) and a deck 51 ft wide.

Who owns I 80 EB over SR 4009?

It is owned by the State Highway Agency.