I 80 EB over Fishing CR & T-360
GoodColumbia County, Pennsylvania · 2 MI East of Buckhorn · Structure no. 000000000045784
- Built
- 2009
- 16 years old
- Condition
- Good
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 504 ft
- 4 main spans
- Daily traffic
- 14,993
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I 80 EB over Fishing CR & T-360 is a prestressed concrete stringer/multi-beam or girder carrying I 80 EB over Fishing CR & T-360 in Columbia County, Pennsylvania. It was built in 2009, so it is 16 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 14,993 vehicles a day, roughly 35% of them trucks, projected to reach 25,251 by 2032. The structure is 504 ft (153.6 m) long and 50 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 80 EB over Fishing CR & T-360 built?
It was built in 2009, making it 16 years old in 2025.
What condition is I 80 EB over Fishing CR & T-360 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does I 80 EB over Fishing CR & T-360 carry?
About 14,993 vehicles per day (2024 count), of which roughly 35% are trucks.
How long is I 80 EB over Fishing CR & T-360?
The structure is 504 ft (153.6 m) long with a longest span of 138 ft (42.1 m) and a deck 50 ft wide.
Who owns I 80 EB over Fishing CR & T-360?
It is owned by the State Highway Agency.