US Bridges

SR 1006 over SR 80-I 80

Fair

Clearfield County, Pennsylvania · 2 MI W Exit 120 · Structure no. 000000000011651

Built
1965
60 years old
Condition
Fair
inspected June 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
148 ft
3 main spans
Daily traffic
432
2024 count
Owner
State
State Highway Agency

About this bridge

SR 1006 over SR 80-I 80 is a prestressed concrete box beam or girders - multiple carrying SR 1006 over SR 80-I 80 in Clearfield County, Pennsylvania. It was built in 1965, so it is 60 years old, older than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 432 vehicles a day, roughly 1% of them trucks, projected to reach 1,081 by 2043. The structure is 148 ft (45.1 m) long and 37 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesSR 1006
CrossesSR 80-I 80
Location2 MI W Exit 120
RouteState Highway 0
Coordinates41.05204, -78.42831
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating52 US tons
Inventory rating31 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length148 ft (45.1 m)
Longest span58 ft (17.7 m)
Deck width37 ft (11.4 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic432 (2024)
Projected traffic1,081 by 2043
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$1.1 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 1006 over SR 80-I 80 built?

It was built in 1965, making it 60 years old in 2025.

What condition is SR 1006 over SR 80-I 80 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does SR 1006 over SR 80-I 80 carry?

About 432 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is SR 1006 over SR 80-I 80?

The structure is 148 ft (45.1 m) long with a longest span of 58 ft (17.7 m) and a deck 37 ft wide.

Who owns SR 1006 over SR 80-I 80?

It is owned by the State Highway Agency.