US Bridges

(forest )gordon RD over SR 80-I 80

Fair

Clearfield County, Pennsylvania · 2 MI W Exit 111 · Structure no. 000000000011287

Built
1970
55 years old
Condition
Fair
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
181 ft
3 main spans
Daily traffic
8
2024 count
Owner
State
State Highway Agency

About this bridge

(forest )gordon RD over SR 80-I 80 is a prestressed concrete stringer/multi-beam or girder carrying (forest )gordon RD over SR 80-I 80 in Clearfield County, Pennsylvania. It was built in 1970, so it is 55 years old, older than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 8 vehicles a day, roughly 10% of them trucks, projected to reach 6 by 2043. The structure is 181 ft (55.2 m) long and 40 ft wide. If it were closed, the detour would be 16.2 mi (26 km).

Carries(forest )gordon RD
CrossesSR 80-I 80
Location2 MI W Exit 111
RouteState Highway 0
Coordinates41.125, -78.56667
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating80 US tons
Inventory rating34 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length181 ft (55.2 m)
Longest span90 ft (27.4 m)
Deck width40 ft (12.2 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8 (2024)
Projected traffic6 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed16.2 mi (26 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was (forest )gordon RD over SR 80-I 80 built?

It was built in 1970, making it 55 years old in 2025.

What condition is (forest )gordon RD over SR 80-I 80 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does (forest )gordon RD over SR 80-I 80 carry?

About 8 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is (forest )gordon RD over SR 80-I 80?

The structure is 181 ft (55.2 m) long with a longest span of 90 ft (27.4 m) and a deck 40 ft wide.

Who owns (forest )gordon RD over SR 80-I 80?

It is owned by the State Highway Agency.