SR 14 over Trib South Fork Sugar CR
FairBradford County, Pennsylvania · 2 Mi.S.Of Troy Borough · Structure no. 000000000006073
- Built
- 1951
- 74 years old, rebuilt 1999
- Condition
- Fair
- inspected August 2024
- Type
- Tee Beam
- Concrete
- Length
- 23 ft
- 1 main span
- Daily traffic
- 3,587
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 14 over Trib South Fork Sugar CR is a concrete tee beam carrying SR 14 over Trib South Fork Sugar CR in Bradford County, Pennsylvania. It was built in 1951 and reconstructed in 1999, so it is 74 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,587 vehicles a day, roughly 12% of them trucks, projected to reach 7,767 by 2032. The structure is 23 ft (7 m) long and 51 ft wide. If it were closed, the detour would be 65.2 mi (105 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 14 over Trib South Fork Sugar CR built?
It was built in 1951, making it 74 years old in 2025. It was reconstructed in 1999.
What condition is SR 14 over Trib South Fork Sugar CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does SR 14 over Trib South Fork Sugar CR carry?
About 3,587 vehicles per day (2024 count), of which roughly 12% are trucks.
How long is SR 14 over Trib South Fork Sugar CR?
The structure is 23 ft (7 m) long with a longest span of 22 ft (6.7 m) and a deck 51 ft wide.
Who owns SR 14 over Trib South Fork Sugar CR?
It is owned by the State Highway Agency.