US Bridges

SR 2025 over Garretts Run

Good

Armstrong County, Pennsylvania · .3 Mi. E SR 2010 Inter. · Structure no. 000000000046708

Built
2011
14 years old
Condition
Good
inspected May 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
48 ft
1 main span
Daily traffic
676
2024 count
Owner
State
State Highway Agency

About this bridge

SR 2025 over Garretts Run is a prestressed concrete box beam or girders - multiple carrying SR 2025 over Garretts Run in Armstrong County, Pennsylvania. It was built in 2011, so it is 14 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 676 vehicles a day, roughly 1% of them trucks, projected to reach 1,091 by 2032. The structure is 48 ft (14.6 m) long and 35 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesSR 2025
CrossesGarretts Run
Location.3 Mi. E SR 2010 Inter.
RouteState Highway 0
Coordinates40.78544, -79.50482
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating66.5 US tons
Inventory rating40 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length48 ft (14.6 m)
Longest span48 ft (14.6 m)
Deck width35 ft (10.8 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic676 (2024)
Projected traffic1,091 by 2032
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 2025 over Garretts Run built?

It was built in 2011, making it 14 years old in 2025.

What condition is SR 2025 over Garretts Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does SR 2025 over Garretts Run carry?

About 676 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is SR 2025 over Garretts Run?

The structure is 48 ft (14.6 m) long with a longest span of 48 ft (14.6 m) and a deck 35 ft wide.

Who owns SR 2025 over Garretts Run?

It is owned by the State Highway Agency.