US Bridges

SR 2025 over Garretts Run

Good

Armstrong County, Pennsylvania · Garretts Run NO.3 · Structure no. 000000000044056

Built
2006
19 years old
Condition
Good
inspected January 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
70 ft
1 main span
Daily traffic
549
2023 count
Owner
State
State Highway Agency

About this bridge

SR 2025 over Garretts Run is a prestressed concrete box beam or girders - multiple carrying SR 2025 over Garretts Run in Armstrong County, Pennsylvania. It was built in 2006, so it is 19 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 549 vehicles a day, roughly 5% of them trucks, projected to reach 1,090 by 2032. The structure is 70 ft (21.3 m) long and 41 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesSR 2025
CrossesGarretts Run
LocationGarretts Run NO.3
RouteState Highway 0
Coordinates40.78789, -79.51006
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating66 US tons
Inventory rating39 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length70 ft (21.3 m)
Longest span70 ft (21.3 m)
Deck width41 ft (12.6 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic549 (2023)
Projected traffic1,090 by 2032
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 2025 over Garretts Run built?

It was built in 2006, making it 19 years old in 2025.

What condition is SR 2025 over Garretts Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does SR 2025 over Garretts Run carry?

About 549 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is SR 2025 over Garretts Run?

The structure is 70 ft (21.3 m) long with a longest span of 70 ft (21.3 m) and a deck 41 ft wide.

Who owns SR 2025 over Garretts Run?

It is owned by the State Highway Agency.