US Bridges

SR 2025 over Garretts Run

Good

Armstrong County, Pennsylvania · Garretts Run No. 1 · Structure no. 000000000045474

Built
2009
16 years old
Condition
Good
inspected May 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
50 ft
1 main span
Daily traffic
676
2024 count
Owner
State
State Highway Agency

About this bridge

SR 2025 over Garretts Run is a prestressed concrete box beam or girders - multiple carrying SR 2025 over Garretts Run in Armstrong County, Pennsylvania. It was built in 2009, so it is 16 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 676 vehicles a day, roughly 1% of them trucks, projected to reach 1,091 by 2032. The structure is 50 ft (15.2 m) long and 38 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesSR 2025
CrossesGarretts Run
LocationGarretts Run No. 1
RouteState Highway 0
Coordinates40.7837, -79.49503
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating82 US tons
Inventory rating49.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length50 ft (15.2 m)
Longest span48 ft (14.6 m)
Deck width38 ft (11.5 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic676 (2024)
Projected traffic1,091 by 2032
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 2025 over Garretts Run built?

It was built in 2009, making it 16 years old in 2025.

What condition is SR 2025 over Garretts Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does SR 2025 over Garretts Run carry?

About 676 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is SR 2025 over Garretts Run?

The structure is 50 ft (15.2 m) long with a longest span of 48 ft (14.6 m) and a deck 38 ft wide.

Who owns SR 2025 over Garretts Run?

It is owned by the State Highway Agency.