Ramp S over Mcknight/Evergreen RD
GoodAllegheny County, Pennsylvania · Hov Mcknight Interchange · Structure no. 000000000002919
- Built
- 1986
- 39 years old
- Condition
- Good
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 637 ft
- 7 main spans
- Daily traffic
- 194
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Ramp S over Mcknight/Evergreen RD is a steel continuous stringer/multi-beam or girder carrying Ramp S over Mcknight/Evergreen RD in Allegheny County, Pennsylvania. It was built in 1986, so it is 39 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 194 vehicles a day, roughly 7% of them trucks, projected to reach 781 by 2032. The structure is 637 ft (194.2 m) long and 26 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ramp S over Mcknight/Evergreen RD built?
It was built in 1986, making it 39 years old in 2025.
What condition is Ramp S over Mcknight/Evergreen RD in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does Ramp S over Mcknight/Evergreen RD carry?
About 194 vehicles per day (2024 count), of which roughly 7% are trucks.
How long is Ramp S over Mcknight/Evergreen RD?
The structure is 637 ft (194.2 m) long with a longest span of 154 ft (46.9 m) and a deck 26 ft wide.
Who owns Ramp S over Mcknight/Evergreen RD?
It is owned by the State Highway Agency.