Scapplehorn Road over Umatilla Project Phase I
GoodUmatilla County, Oregon · Canal Sta 39+17.02 · Structure no. 17PIE0002
- Built
- 1992
- 33 years old
- Condition
- Good
- inspected March 2022
- Type
- Slab
- Concrete Continuous
- Length
- 32 ft
- 2 main spans
- Daily traffic
- 1
- 2022 count
- Owner
- Federal
- Bureau of Reclamation
About this bridge
Scapplehorn Road over Umatilla Project Phase I is a concrete continuous slab carrying Scapplehorn Road over Umatilla Project Phase I in Umatilla County, Oregon. It was built in 1992, so it is 33 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1 vehicles a day, projected to reach 1 by 2042. The structure is 32 ft (9.7 m) long and 43 ft wide. If it were closed, the detour would be 198.8 mi (320 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Scapplehorn Road over Umatilla Project Phase I built?
It was built in 1992, making it 33 years old in 2025.
What condition is Scapplehorn Road over Umatilla Project Phase I in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2022.
How much traffic does Scapplehorn Road over Umatilla Project Phase I carry?
About 1 vehicles per day (2022 count).
How long is Scapplehorn Road over Umatilla Project Phase I?
The structure is 32 ft (9.7 m) long with a longest span of 12 ft (3.6 m) and a deck 43 ft wide.
Who owns Scapplehorn Road over Umatilla Project Phase I?
It is owned by the Bureau of Reclamation.