Conforth Access RD over Umatilla Project Phase I
GoodUmatilla County, Oregon · Canal Sta 68+65.17 · Structure no. 17PIE0005
- Built
- 1992
- 33 years old
- Condition
- Good
- inspected February 2024
- Type
- Slab
- Concrete Continuous
- Length
- 28 ft
- 2 main spans
- Daily traffic
- 25
- 2024 count
- Owner
- Federal
- Bureau of Reclamation
About this bridge
Conforth Access RD over Umatilla Project Phase I is a concrete continuous slab carrying Conforth Access RD over Umatilla Project Phase I in Umatilla County, Oregon. It was built in 1992, so it is 33 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 25 vehicles a day, roughly 33% of them trucks, projected to reach 25 by 2044. The structure is 28 ft (8.5 m) long and 32 ft wide. If it were closed, the detour would be 198.8 mi (320 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Conforth Access RD over Umatilla Project Phase I built?
It was built in 1992, making it 33 years old in 2025.
What condition is Conforth Access RD over Umatilla Project Phase I in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does Conforth Access RD over Umatilla Project Phase I carry?
About 25 vehicles per day (2024 count), of which roughly 33% are trucks.
How long is Conforth Access RD over Umatilla Project Phase I?
The structure is 28 ft (8.5 m) long with a longest span of 10 ft (3.2 m) and a deck 32 ft wide.
Who owns Conforth Access RD over Umatilla Project Phase I?
It is owned by the Bureau of Reclamation.