NW Alexandra Ave over B-14 over Canyon
FairPosted for loadMultnomah County, Oregon · W End of NW Gordon ST · Structure no. 25B14 000
- Built
- 1922
- 103 years old
- Condition
- Fair
- inspected September 2024
- Type
- Arch - Deck
- Concrete
- Length
- 272 ft
- 1 main span
- Daily traffic
- 137
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
NW Alexandra Ave over B-14 over Canyon is a concrete arch - deck carrying NW Alexandra Ave over B-14 over Canyon in Multnomah County, Oregon. It was built in 1922, so it is 103 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 137 vehicles a day, roughly 1% of them trucks, projected to reach 151 by 2025. The structure is 272 ft (82.9 m) long and 23 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NW Alexandra Ave over B-14 over Canyon built?
It was built in 1922, making it 103 years old in 2025.
What condition is NW Alexandra Ave over B-14 over Canyon in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does NW Alexandra Ave over B-14 over Canyon carry?
About 137 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is NW Alexandra Ave over B-14 over Canyon?
The structure is 272 ft (82.9 m) long with a longest span of 150 ft (45.7 m) and a deck 23 ft wide.
Who owns NW Alexandra Ave over B-14 over Canyon?
It is owned by the City or Municipal Highway Agency.