Yeon/Front-Nw 26th over B-129 over Bn/Sfrr
FairMultnomah County, Oregon · NW Front/Nw Yeon Connect · Structure no. 16660 000000000
- Built
- 1987
- 38 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 1,320 ft
- 3 main spans
- Daily traffic
- 5,200
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Yeon/Front-Nw 26th over B-129 over Bn/Sfrr is a steel continuous stringer/multi-beam or girder carrying Yeon/Front-Nw 26th over B-129 over Bn/Sfrr in Multnomah County, Oregon. It was built in 1987, so it is 38 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,200 vehicles a day, roughly 20% of them trucks, projected to reach 5,890 by 2025. The structure is 1,320 ft (402.3 m) long and 49 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Yeon/Front-Nw 26th over B-129 over Bn/Sfrr built?
It was built in 1987, making it 38 years old in 2025.
What condition is Yeon/Front-Nw 26th over B-129 over Bn/Sfrr in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Yeon/Front-Nw 26th over B-129 over Bn/Sfrr carry?
About 5,200 vehicles per day (2020 count), of which roughly 20% are trucks.
How long is Yeon/Front-Nw 26th over B-129 over Bn/Sfrr?
The structure is 1,320 ft (402.3 m) long with a longest span of 204 ft (62.2 m) and a deck 49 ft wide.
Who owns Yeon/Front-Nw 26th over B-129 over Bn/Sfrr?
It is owned by the City or Municipal Highway Agency.