Glisan ST over Max Light Rail Transit
FairMultnomah County, Oregon · Near Glisan ST Oxing I-20 · Structure no. 16544 000 00000
- Built
- 1985
- 40 years old
- Condition
- Fair
- inspected March 2023
- Type
- Frame
- Concrete
- Length
- 36 ft
- 1 main span
- Daily traffic
- 137,312
- 2022 count
- Owner
- Local
- Other Local Agency
About this bridge
Glisan ST over Max Light Rail Transit is a concrete frame carrying Glisan ST over Max Light Rail Transit in Multnomah County, Oregon. It was built in 1985, so it is 40 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 137,312 vehicles a day, roughly 8% of them trucks, projected to reach 169,300 by 2042. The structure is 36 ft (11.1 m) long and 105 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Glisan ST over Max Light Rail Transit built?
It was built in 1985, making it 40 years old in 2025.
What condition is Glisan ST over Max Light Rail Transit in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Glisan ST over Max Light Rail Transit carry?
About 137,312 vehicles per day (2022 count), of which roughly 8% are trucks.
How long is Glisan ST over Max Light Rail Transit?
The structure is 36 ft (11.1 m) long with a longest span of 32 ft (9.8 m) and a deck 105 ft wide.
Who owns Glisan ST over Max Light Rail Transit?
It is owned by the Other Local Agency.