HWY 164 over Santiam River Oflow #4
FairPosted for loadLinn County, Oregon · 009 MI E Linn Marion CO L · Structure no. 00361 164 00712
- Built
- 1958
- 67 years old
- Condition
- Fair
- inspected July 2023
- Type
- Channel Beam
- Concrete
- Length
- 294 ft
- 14 main spans
- Daily traffic
- 7,541
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
HWY 164 over Santiam River Oflow #4 is a concrete channel beam carrying HWY 164 over Santiam River Oflow #4 in Linn County, Oregon. It was built in 1958, so it is 67 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for other load-capacity restriction.
It carries about 7,541 vehicles a day, roughly 9% of them trucks, projected to reach 10,200 by 2042. The structure is 294 ft (89.6 m) long and 29 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HWY 164 over Santiam River Oflow #4 built?
It was built in 1958, making it 67 years old in 2025.
What condition is HWY 164 over Santiam River Oflow #4 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does HWY 164 over Santiam River Oflow #4 carry?
About 7,541 vehicles per day (2022 count), of which roughly 9% are trucks.
How long is HWY 164 over Santiam River Oflow #4?
The structure is 294 ft (89.6 m) long with a longest span of 21 ft (6.4 m) and a deck 29 ft wide.
Who owns HWY 164 over Santiam River Oflow #4?
It is owned by the State Highway Agency.