HWY 164 over Santiam River Oflow
FairPosted for loadLinn County, Oregon · 007 MI E Marion Linn CO L · Structure no. 00360A164 00698
- Built
- 1960
- 65 years old, rebuilt 1965
- Condition
- Fair
- inspected July 2023
- Type
- Slab
- Prestressed Concrete
- Length
- 473 ft
- 19 main spans
- Daily traffic
- 7,541
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
HWY 164 over Santiam River Oflow is a prestressed concrete slab carrying HWY 164 over Santiam River Oflow in Linn County, Oregon. It was built in 1960 and reconstructed in 1965, so it is 65 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for other load-capacity restriction.
It carries about 7,541 vehicles a day, roughly 9% of them trucks, projected to reach 10,200 by 2042. The structure is 473 ft (144.2 m) long and 30 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HWY 164 over Santiam River Oflow built?
It was built in 1960, making it 65 years old in 2025. It was reconstructed in 1965.
What condition is HWY 164 over Santiam River Oflow in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does HWY 164 over Santiam River Oflow carry?
About 7,541 vehicles per day (2022 count), of which roughly 9% are trucks.
How long is HWY 164 over Santiam River Oflow?
The structure is 473 ft (144.2 m) long with a longest span of 25 ft (7.6 m) and a deck 30 ft wide.
Who owns HWY 164 over Santiam River Oflow?
It is owned by the State Highway Agency.