Ivory Pine Road over Drainage Swale
FairKlamath County, Oregon · 014 MI N HWY 140 · Structure no. 35C221125700140
- Built
- 1981
- 44 years old
- Condition
- Fair
- inspected July 2024
- Type
- Slab
- Prestressed Concrete
- Length
- 51 ft
- 1 main span
- Daily traffic
- 248
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Ivory Pine Road over Drainage Swale is a prestressed concrete slab carrying Ivory Pine Road over Drainage Swale in Klamath County, Oregon. It was built in 1981, so it is 44 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 248 vehicles a day, roughly 10% of them trucks, projected to reach 263 by 2025. The structure is 51 ft (15.5 m) long and 32 ft wide. If it were closed, the detour would be 49.7 mi (80 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ivory Pine Road over Drainage Swale built?
It was built in 1981, making it 44 years old in 2025.
What condition is Ivory Pine Road over Drainage Swale in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Ivory Pine Road over Drainage Swale carry?
About 248 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is Ivory Pine Road over Drainage Swale?
The structure is 51 ft (15.5 m) long with a longest span of 50 ft (15.2 m) and a deck 32 ft wide.
Who owns Ivory Pine Road over Drainage Swale?
It is owned by the County Highway Agency.