Ivory Pine Road over Drainage Swale
GoodKlamath County, Oregon · 011 MI N HWY 140 · Structure no. 35C220125700110
- Built
- 1981
- 44 years old
- Condition
- Good
- inspected July 2024
- Type
- Slab
- Prestressed Concrete
- Length
- 39 ft
- 1 main span
- Daily traffic
- 248
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Ivory Pine Road over Drainage Swale is a prestressed concrete slab carrying Ivory Pine Road over Drainage Swale in Klamath County, Oregon. It was built in 1981, so it is 44 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 248 vehicles a day, roughly 10% of them trucks, projected to reach 263 by 2025. The structure is 39 ft (11.9 m) long and 32 ft wide. If it were closed, the detour would be 49.7 mi (80 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ivory Pine Road over Drainage Swale built?
It was built in 1981, making it 44 years old in 2025.
What condition is Ivory Pine Road over Drainage Swale in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does Ivory Pine Road over Drainage Swale carry?
About 248 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is Ivory Pine Road over Drainage Swale?
The structure is 39 ft (11.9 m) long with a longest span of 38 ft (11.6 m) and a deck 32 ft wide.
Who owns Ivory Pine Road over Drainage Swale?
It is owned by the County Highway Agency.