HWY 026 (or 35) over E Fork Hood R
FairHood River County, Oregon · 11.7 MI S Mt Hood Po · Structure no. 03640A026 07326
- Built
- 1962
- 63 years old
- Condition
- Fair
- inspected July 2024
- Type
- Tee Beam
- Concrete Continuous
- Length
- 100 ft
- 3 main spans
- Daily traffic
- 1,809
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
HWY 026 (or 35) over E Fork Hood R is a concrete continuous tee beam carrying HWY 026 (or 35) over E Fork Hood R in Hood River County, Oregon. It was built in 1962, so it is 63 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,809 vehicles a day, roughly 14% of them trucks, projected to reach 1,900 by 2042. The structure is 100 ft (30.5 m) long and 35 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HWY 026 (or 35) over E Fork Hood R built?
It was built in 1962, making it 63 years old in 2025.
What condition is HWY 026 (or 35) over E Fork Hood R in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does HWY 026 (or 35) over E Fork Hood R carry?
About 1,809 vehicles per day (2022 count), of which roughly 14% are trucks.
How long is HWY 026 (or 35) over E Fork Hood R?
The structure is 100 ft (30.5 m) long with a longest span of 65 ft (19.8 m) and a deck 35 ft wide.
Who owns HWY 026 (or 35) over E Fork Hood R?
It is owned by the State Highway Agency.