US 395 (hwy 028) over Beech Crk (7th Xing)
FairGrant County, Oregon · 6.2 Mi. N. Jct. US 26 · Structure no. 03556A028 11362
- Built
- 1972
- 53 years old
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 128 ft
- 1 main span
- Daily traffic
- 536
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
US 395 (hwy 028) over Beech Crk (7th Xing) is a prestressed concrete stringer/multi-beam or girder carrying US 395 (hwy 028) over Beech Crk (7th Xing) in Grant County, Oregon. It was built in 1972, so it is 53 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 536 vehicles a day, roughly 36% of them trucks, projected to reach 570 by 2042. The structure is 128 ft (38.9 m) long and 35 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 395 (hwy 028) over Beech Crk (7th Xing) built?
It was built in 1972, making it 53 years old in 2025.
What condition is US 395 (hwy 028) over Beech Crk (7th Xing) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does US 395 (hwy 028) over Beech Crk (7th Xing) carry?
About 536 vehicles per day (2022 count), of which roughly 36% are trucks.
How long is US 395 (hwy 028) over Beech Crk (7th Xing)?
The structure is 128 ft (38.9 m) long with a longest span of 125 ft (38.1 m) and a deck 35 ft wide.
Who owns US 395 (hwy 028) over Beech Crk (7th Xing)?
It is owned by the State Highway Agency.