US 395 (hwy 028) over Beech Crk (8th Xing)
GoodPosted for loadGrant County, Oregon · 1.6 Mi. N. Jct. US 26 · Structure no. 09659 028 11828
- Built
- 1967
- 58 years old
- Condition
- Good
- inspected August 2023
- Type
- Slab
- Concrete Continuous
- Length
- 127 ft
- 3 main spans
- Daily traffic
- 774
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
US 395 (hwy 028) over Beech Crk (8th Xing) is a concrete continuous slab carrying US 395 (hwy 028) over Beech Crk (8th Xing) in Grant County, Oregon. It was built in 1967, so it is 58 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for other load-capacity restriction.
It carries about 774 vehicles a day, roughly 36% of them trucks, projected to reach 820 by 2042. The structure is 127 ft (38.7 m) long and 32 ft wide. If it were closed, the detour would be 52.2 mi (84 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 395 (hwy 028) over Beech Crk (8th Xing) built?
It was built in 1967, making it 58 years old in 2025.
What condition is US 395 (hwy 028) over Beech Crk (8th Xing) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does US 395 (hwy 028) over Beech Crk (8th Xing) carry?
About 774 vehicles per day (2022 count), of which roughly 36% are trucks.
How long is US 395 (hwy 028) over Beech Crk (8th Xing)?
The structure is 127 ft (38.7 m) long with a longest span of 50 ft (15.2 m) and a deck 32 ft wide.
Who owns US 395 (hwy 028) over Beech Crk (8th Xing)?
It is owned by the State Highway Agency.