US Bridges

Hemlock Ave over Pilot Butte Main Canal

Fair

Deschutes County, Oregon · 00.01 MI E of Canal Road · Structure no. 17C19 C37 00001

Built
1967
58 years old
Condition
Fair
inspected March 2024
Type
Stringer/Multi-beam or Girder
Wood or Timber
Length
33 ft
2 main spans
Daily traffic
700
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Hemlock Ave over Pilot Butte Main Canal is a wood or timber stringer/multi-beam or girder carrying Hemlock Ave over Pilot Butte Main Canal in Deschutes County, Oregon. It was built in 1967, so it is 58 years old, older than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 700 vehicles a day, roughly 2% of them trucks, projected to reach 805 by 2025. The structure is 33 ft (10.1 m) long and 35 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesHemlock Ave
CrossesPilot Butte Main Canal
Location00.01 MI E of Canal Road
RouteCounty Highway 2307
StateOregon
Coordinates44.28376, -121.16902
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating37.1 US tons
Inventory rating28.5 US tons

Structure

MaterialWood or Timber
DeckWood or timber
Main spans2
Design loadUnknown
Structure length33 ft (10.1 m)
Longest span16 ft (4.9 m)
Deck width35 ft (10.7 m)
Roadway width31 ft (9.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic700 (2020)
Projected traffic805 by 2025
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Hemlock Ave over Pilot Butte Main Canal built?

It was built in 1967, making it 58 years old in 2025.

What condition is Hemlock Ave over Pilot Butte Main Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does Hemlock Ave over Pilot Butte Main Canal carry?

About 700 vehicles per day (2020 count), of which roughly 2% are trucks.

How long is Hemlock Ave over Pilot Butte Main Canal?

The structure is 33 ft (10.1 m) long with a longest span of 16 ft (4.9 m) and a deck 35 ft wide.

Who owns Hemlock Ave over Pilot Butte Main Canal?

It is owned by the City or Municipal Highway Agency.