US Bridges

2nd Street over Coi Canal

Fair

Deschutes County, Oregon · 2nd St. @ Coi Canal · Structure no. 19839 000 00000

Built
2005
20 years old
Condition
Fair
inspected March 2024
Type
Slab
Prestressed Concrete
Length
42 ft
1 main span
Daily traffic
718
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

2nd Street over Coi Canal is a prestressed concrete slab carrying 2nd Street over Coi Canal in Deschutes County, Oregon. It was built in 2005, so it is 20 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 718 vehicles a day, roughly 10% of them trucks, projected to reach 817 by 2025. The structure is 42 ft (12.8 m) long and 52 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

Carries2nd Street
CrossesCoi Canal
Location2nd St. @ Coi Canal
RouteCounty Highway 0
StateOregon
Coordinates44.29353, -121.16882
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating57.9 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHL 93
Structure length42 ft (12.8 m)
Longest span42 ft (12.8 m)
Deck width52 ft (16 m)
Roadway width36 ft (11 m)
Vertical clearance over deck0 ft (0 m)

Traffic and service

Average daily traffic718 (2020)
Projected traffic817 by 2025
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 2nd Street over Coi Canal built?

It was built in 2005, making it 20 years old in 2025.

What condition is 2nd Street over Coi Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does 2nd Street over Coi Canal carry?

About 718 vehicles per day (2020 count), of which roughly 10% are trucks.

How long is 2nd Street over Coi Canal?

The structure is 42 ft (12.8 m) long with a longest span of 42 ft (12.8 m) and a deck 52 ft wide.

Who owns 2nd Street over Coi Canal?

It is owned by the City or Municipal Highway Agency.