US Bridges

Feyrer Park over Molalla River

Good

Clackamas County, Oregon · 1.7 MI E of HWY 211 · Structure no. 20148 008 00168

Built
2008
17 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
252 ft
2 main spans
Daily traffic
1,964
2020 count
Owner
County
County Highway Agency

About this bridge

Feyrer Park over Molalla River is a prestressed concrete stringer/multi-beam or girder carrying Feyrer Park over Molalla River in Clackamas County, Oregon. It was built in 2008, so it is 17 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,964 vehicles a day, roughly 10% of them trucks, projected to reach 2,189 by 2025. The structure is 252 ft (76.8 m) long and 50 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesFeyrer Park
CrossesMolalla River
Location1.7 MI E of HWY 211
RouteCounty Highway 0A607
StateOregon
Coordinates45.13863, -122.5336
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating55.7 US tons
Inventory rating42.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length252 ft (76.8 m)
Longest span126 ft (38.4 m)
Deck width50 ft (15.2 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,964 (2020)
Projected traffic2,189 by 2025
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Feyrer Park over Molalla River built?

It was built in 2008, making it 17 years old in 2025.

What condition is Feyrer Park over Molalla River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Feyrer Park over Molalla River carry?

About 1,964 vehicles per day (2020 count), of which roughly 10% are trucks.

How long is Feyrer Park over Molalla River?

The structure is 252 ft (76.8 m) long with a longest span of 126 ft (38.4 m) and a deck 50 ft wide.

Who owns Feyrer Park over Molalla River?

It is owned by the County Highway Agency.