Beaver Creek RD over Milk Creek
FairPosted for loadClackamas County, Oregon · 020 MI North of HWY 211 · Structure no. 06198 033 00017
- Built
- 1959
- 66 years old
- Condition
- Fair
- inspected April 2023
- Type
- Girder and Floorbeam System
- Steel
- Length
- 50 ft
- 1 main span
- Daily traffic
- 1,699
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Beaver Creek RD over Milk Creek is a steel girder and floorbeam system carrying Beaver Creek RD over Milk Creek in Clackamas County, Oregon. It was built in 1959, so it is 66 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 1,699 vehicles a day, roughly 15% of them trucks, projected to reach 1,724 by 2025. The structure is 50 ft (15.2 m) long and 30 ft wide. If it were closed, the detour would be 9.3 mi (15 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Beaver Creek RD over Milk Creek built?
It was built in 1959, making it 66 years old in 2025.
What condition is Beaver Creek RD over Milk Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Beaver Creek RD over Milk Creek carry?
About 1,699 vehicles per day (2020 count), of which roughly 15% are trucks.
How long is Beaver Creek RD over Milk Creek?
The structure is 50 ft (15.2 m) long with a longest span of 46 ft (14 m) and a deck 30 ft wide.
Who owns Beaver Creek RD over Milk Creek?
It is owned by the County Highway Agency.