US Bridges

U.S. 75 NB over Skelly Dr. &mooser Ck Un

Good

Tulsa County, Oklahoma · 9.8 N of S.H.67 · Structure no. 326730000000000

Built
2021
4 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
276 ft
3 main spans
Daily traffic
22,800
2022 count
Owner
State
State Highway Agency

About this bridge

U.S. 75 NB over Skelly Dr. &mooser Ck Un is a prestressed concrete stringer/multi-beam or girder carrying U.S. 75 NB over Skelly Dr. &mooser Ck Un in Tulsa County, Oklahoma. It was built in 2021, so it is 4 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 22,800 vehicles a day, roughly 10% of them trucks, projected to reach 35,760 by 2042. The structure is 276 ft (84 m) long and 75 ft wide.

CarriesU.S. 75 NB
CrossesSkelly Dr. &mooser Ck Un
Location9.8 N of S.H.67
RouteU.S. Route 75
Coordinates36.08678, -96.0065
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating81.7 US tons
Inventory rating63.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length276 ft (84 m)
Longest span103 ft (31.3 m)
Deck width75 ft (22.8 m)
Roadway width72 ft (21.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic22,800 (2022)
Projected traffic35,760 by 2042
Trucks10%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was U.S. 75 NB over Skelly Dr. &mooser Ck Un built?

It was built in 2021, making it 4 years old in 2025.

What condition is U.S. 75 NB over Skelly Dr. &mooser Ck Un in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does U.S. 75 NB over Skelly Dr. &mooser Ck Un carry?

About 22,800 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is U.S. 75 NB over Skelly Dr. &mooser Ck Un?

The structure is 276 ft (84 m) long with a longest span of 103 ft (31.3 m) and a deck 75 ft wide.

Who owns U.S. 75 NB over Skelly Dr. &mooser Ck Un?

It is owned by the State Highway Agency.