US Bridges

Gilcrease Expwy EB over U.S. 75 SB under

Good

Tulsa County, Oklahoma · U.S. 75/S.H. 11 · Structure no. 272450000000000

Built
2002
23 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
220 ft
3 main spans
Daily traffic
12,850
2022 count
Owner
State
State Highway Agency

About this bridge

Gilcrease Expwy EB over U.S. 75 SB under is a prestressed concrete stringer/multi-beam or girder carrying Gilcrease Expwy EB over U.S. 75 SB under in Tulsa County, Oklahoma. It was built in 2002, so it is 23 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 12,850 vehicles a day, roughly 7% of them trucks, projected to reach 20,560 by 2042. The structure is 220 ft (67.1 m) long and 65 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesGilcrease Expwy EB
CrossesU.S. 75 SB under
LocationU.S. 75/S.H. 11
RouteCity Street 0
Coordinates36.19848, -95.95144
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65.6 US tons
Inventory rating39.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length220 ft (67.1 m)
Longest span98 ft (30 m)
Deck width65 ft (19.8 m)
Roadway width62 ft (18.9 m)
Vertical clearance over deck17 ft (5.3 m)

Traffic and service

Average daily traffic12,850 (2022)
Projected traffic20,560 by 2042
Trucks7%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$3.9 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Gilcrease Expwy EB over U.S. 75 SB under built?

It was built in 2002, making it 23 years old in 2025.

What condition is Gilcrease Expwy EB over U.S. 75 SB under in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Gilcrease Expwy EB over U.S. 75 SB under carry?

About 12,850 vehicles per day (2022 count), of which roughly 7% are trucks.

How long is Gilcrease Expwy EB over U.S. 75 SB under?

The structure is 220 ft (67.1 m) long with a longest span of 98 ft (30 m) and a deck 65 ft wide.

Who owns Gilcrease Expwy EB over U.S. 75 SB under?

It is owned by the State Highway Agency.