US Bridges

FAU 8180 (washingt over Haikey Creek

Fair

Tulsa County, Oklahoma · .7E of Garnett · Structure no. 270500000000000

Built
2001
24 years old
Condition
Fair
inspected February 2023
Type
Culvert
Concrete
Length
91 ft
4 main spans
Daily traffic
18,470
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

FAU 8180 (washingt over Haikey Creek is a concrete culvert carrying FAU 8180 (washingt over Haikey Creek in Tulsa County, Oklahoma. It was built in 2001, so it is 24 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 18,470 vehicles a day, roughly 5% of them trucks, projected to reach 13,720 by 2042. The structure is 91 ft (27.7 m) long and 102 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesFAU 8180 (washingt
CrossesHaikey Creek
Location.7E of Garnett
RouteCity Street E0680
Coordinates36.03176, -95.83908
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64 US tons
Inventory rating38 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadHS 20
Structure length91 ft (27.7 m)
Longest span22 ft (6.7 m)
Deck width102 ft (31.1 m)
Roadway width61 ft (18.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,470 (2022)
Projected traffic13,720 by 2042
Trucks5%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$225,000
NavigationNo navigation control on waterway

Frequently asked questions

When was FAU 8180 (washingt over Haikey Creek built?

It was built in 2001, making it 24 years old in 2025.

What condition is FAU 8180 (washingt over Haikey Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does FAU 8180 (washingt over Haikey Creek carry?

About 18,470 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is FAU 8180 (washingt over Haikey Creek?

The structure is 91 ft (27.7 m) long with a longest span of 22 ft (6.7 m) and a deck 102 ft wide.

Who owns FAU 8180 (washingt over Haikey Creek?

It is owned by the City or Municipal Highway Agency.