US Bridges

FAU 8180(91 St) over Haikey Creek

Good

Tulsa County, Oklahoma · 0.1 MI E of 129 E Ave) · Structure no. 257270000000000

Built
1997
28 years old
Condition
Good
inspected February 2023
Type
Culvert
Concrete
Length
82 ft
4 main spans
Daily traffic
15,733
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

FAU 8180(91 St) over Haikey Creek is a concrete culvert carrying FAU 8180(91 St) over Haikey Creek in Tulsa County, Oklahoma. It was built in 1997, so it is 28 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 15,733 vehicles a day, roughly 5% of them trucks, projected to reach 14,776 by 2042. The structure is 82 ft (25 m) long and 82 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesFAU 8180(91 St)
CrossesHaikey Creek
Location0.1 MI E of 129 E Ave)
RouteCity Street 8180
Coordinates36.03177, -95.83212
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadHS 20
Structure length82 ft (25 m)
Longest span19 ft (5.8 m)
Deck width82 ft (25 m)
Roadway width70 ft (21.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15,733 (2022)
Projected traffic14,776 by 2042
Trucks5%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$225,000
NavigationNo navigation control on waterway

Frequently asked questions

When was FAU 8180(91 St) over Haikey Creek built?

It was built in 1997, making it 28 years old in 2025.

What condition is FAU 8180(91 St) over Haikey Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does FAU 8180(91 St) over Haikey Creek carry?

About 15,733 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is FAU 8180(91 St) over Haikey Creek?

The structure is 82 ft (25 m) long with a longest span of 19 ft (5.8 m) and a deck 82 ft wide.

Who owns FAU 8180(91 St) over Haikey Creek?

It is owned by the City or Municipal Highway Agency.