US Bridges

S.H. 3W over Big Creek

Good

Pontotoc County, Oklahoma · 4.2NW JCT S.H. 59A · Structure no. 274130000000000

Built
2005
20 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
152 ft
3 main spans
Daily traffic
4,000
2022 count
Owner
State
State Highway Agency

About this bridge

S.H. 3W over Big Creek is a prestressed concrete stringer/multi-beam or girder carrying S.H. 3W over Big Creek in Pontotoc County, Oklahoma. It was built in 2005, so it is 20 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,000 vehicles a day, roughly 10% of them trucks, projected to reach 6,400 by 2042. The structure is 152 ft (46.3 m) long and 66 ft wide. If it were closed, the detour would be 39.8 mi (64 km).

CarriesS.H. 3W
CrossesBig Creek
Location4.2NW JCT S.H. 59A
RouteState Highway 3W
Coordinates34.92174, -96.92829
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating77.7 US tons
Inventory rating53.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length152 ft (46.3 m)
Longest span50 ft (15.2 m)
Deck width66 ft (20.2 m)
Roadway width64 ft (19.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,000 (2022)
Projected traffic6,400 by 2042
Trucks10%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed39.8 mi (64 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$4 million
NavigationNo navigation control on waterway

Frequently asked questions

When was S.H. 3W over Big Creek built?

It was built in 2005, making it 20 years old in 2025.

What condition is S.H. 3W over Big Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does S.H. 3W over Big Creek carry?

About 4,000 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is S.H. 3W over Big Creek?

The structure is 152 ft (46.3 m) long with a longest span of 50 ft (15.2 m) and a deck 66 ft wide.

Who owns S.H. 3W over Big Creek?

It is owned by the State Highway Agency.