US Bridges

IRR E0160 over Creek

FairPosted for load

Ottawa County, Oklahoma · 2.4 N. 1.7 W. of Fairland · Structure no. 048480000000000

Built
1936
89 years old
Condition
Fair
inspected September 2023
Type
Slab
Concrete
Length
36 ft
3 main spans
Daily traffic
50
2022 count
Owner
County
County Highway Agency

About this bridge

IRR E0160 over Creek is a concrete slab carrying IRR E0160 over Creek in Ottawa County, Oklahoma. It was built in 1936, so it is 89 years old, older than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 50 vehicles a day, roughly 10% of them trucks, projected to reach 80 by 2042. The structure is 36 ft (11.1 m) long and 28 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesIRR E0160
CrossesCreek
Location2.4 N. 1.7 W. of Fairland
RouteCounty Highway E0160
Coordinates36.78647, -94.87922
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating39.5 US tons
Inventory rating23.7 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length36 ft (11.1 m)
Longest span10 ft (3 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2022)
Projected traffic80 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$294,000
NavigationNo navigation control on waterway

Frequently asked questions

When was IRR E0160 over Creek built?

It was built in 1936, making it 89 years old in 2025.

What condition is IRR E0160 over Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does IRR E0160 over Creek carry?

About 50 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is IRR E0160 over Creek?

The structure is 36 ft (11.1 m) long with a longest span of 10 ft (3 m) and a deck 28 ft wide.

Who owns IRR E0160 over Creek?

It is owned by the County Highway Agency.