US Bridges

Kickapoo Tp NB over N Deer Creek

Good

Oklahoma County, Oklahoma · 1.9N I-40 .4E Luther RD · Structure no. 324410000000000

Built
2021
4 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
362 ft
3 main spans
Daily traffic
10,354
2022 count
Owner
Toll Authority
State Toll Authority

About this bridge

Kickapoo Tp NB over N Deer Creek is a prestressed concrete stringer/multi-beam or girder carrying Kickapoo Tp NB over N Deer Creek in Oklahoma County, Oklahoma. It was built in 2021, so it is 4 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,354 vehicles a day, roughly 12% of them trucks, projected to reach 16,566 by 2042. The structure is 362 ft (110.2 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesKickapoo Tp NB
CrossesN Deer Creek
Location1.9N I-40 .4E Luther RD
RouteInterstate 335
Coordinates35.41222, -97.20222
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.5 US tons
Inventory rating32.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length362 ft (110.2 m)
Longest span120 ft (36.6 m)
Deck width41 ft (12.5 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,354 (2022)
Projected traffic16,566 by 2042
Trucks12%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Kickapoo Tp NB over N Deer Creek built?

It was built in 2021, making it 4 years old in 2025.

What condition is Kickapoo Tp NB over N Deer Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Kickapoo Tp NB over N Deer Creek carry?

About 10,354 vehicles per day (2022 count), of which roughly 12% are trucks.

How long is Kickapoo Tp NB over N Deer Creek?

The structure is 362 ft (110.2 m) long with a longest span of 120 ft (36.6 m) and a deck 41 ft wide.

Who owns Kickapoo Tp NB over N Deer Creek?

It is owned by the State Toll Authority.