US Bridges

Kickapoo Tp over I-40 under

Good

Oklahoma County, Oklahoma · 1.4E Peebly RD &1-40 · Structure no. 324260000000000

Built
2020
5 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
516 ft
5 main spans
Daily traffic
10,354
2022 count
Owner
Toll Authority
State Toll Authority

About this bridge

Kickapoo Tp over I-40 under is a prestressed concrete stringer/multi-beam or girder carrying Kickapoo Tp over I-40 under in Oklahoma County, Oklahoma. It was built in 2020, so it is 5 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,354 vehicles a day, projected to reach 16,566 by 2042. The structure is 516 ft (157.2 m) long and 53 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesKickapoo Tp
CrossesI-40 under
Location1.4E Peebly RD &1-40
RouteInterstate 335
Coordinates35.38444, -97.18778
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56.1 US tons
Inventory rating33.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans5
Design loadHL 93
Structure length516 ft (157.2 m)
Longest span130 ft (39.6 m)
Deck width53 ft (16.2 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,354 (2022)
Projected traffic16,566 by 2042
Trucks—
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Kickapoo Tp over I-40 under built?

It was built in 2020, making it 5 years old in 2025.

What condition is Kickapoo Tp over I-40 under in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Kickapoo Tp over I-40 under carry?

About 10,354 vehicles per day (2022 count).

How long is Kickapoo Tp over I-40 under?

The structure is 516 ft (157.2 m) long with a longest span of 130 ft (39.6 m) and a deck 53 ft wide.

Who owns Kickapoo Tp over I-40 under?

It is owned by the State Toll Authority.