US Bridges

N3130 (sooner Rd.) over Creek

PoorPosted for load

Oklahoma County, Oklahoma · .2S of NE 108th St. · Structure no. 281050000000000

Built
2005
20 years old
Condition
Poor
inspected May 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
100 ft
3 main spans
Daily traffic
1,500
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

N3130 (sooner Rd.) over Creek is a steel stringer/multi-beam or girder carrying N3130 (sooner Rd.) over Creek in Oklahoma County, Oklahoma. It was built in 2005, so it is 20 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.

It carries about 1,500 vehicles a day, roughly 7% of them trucks, projected to reach 2,400 by 2042. The structure is 100 ft (30.5 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesN3130 (sooner Rd.)
CrossesCreek
Location.2S of NE 108th St.
RouteCity Street N3130
Coordinates35.57723, -97.42507
Functional classUrban Minor Arterial

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation2: Basically intolerable, requiring high priority of replacement
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating18 US tons
Inventory rating10 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadH 20
Structure length100 ft (30.5 m)
Longest span40 ft (12.2 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,500 (2022)
Projected traffic2,400 by 2042
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.1 million
NavigationNo navigation control on waterway

Frequently asked questions

When was N3130 (sooner Rd.) over Creek built?

It was built in 2005, making it 20 years old in 2025.

What condition is N3130 (sooner Rd.) over Creek in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in May 2023.

How much traffic does N3130 (sooner Rd.) over Creek carry?

About 1,500 vehicles per day (2022 count), of which roughly 7% are trucks.

How long is N3130 (sooner Rd.) over Creek?

The structure is 100 ft (30.5 m) long with a longest span of 40 ft (12.2 m) and a deck 28 ft wide.

Who owns N3130 (sooner Rd.) over Creek?

It is owned by the City or Municipal Highway Agency.