US Bridges

E0960 (ne 150) over Creek

Good

Oklahoma County, Oklahoma · .7E of Hiwassi Rd. · Structure no. 274740000000000

Built
2003
22 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
40 ft
1 main span
Daily traffic
75
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

E0960 (ne 150) over Creek is a steel stringer/multi-beam or girder carrying E0960 (ne 150) over Creek in Oklahoma County, Oklahoma. It was built in 2003, so it is 22 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 75 vehicles a day, roughly 5% of them trucks, projected to reach 120 by 2042. The structure is 40 ft (12.2 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesE0960 (ne 150)
CrossesCreek
Location.7E of Hiwassi Rd.
RouteCity Street E0960
Coordinates35.62352, -97.28757
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection4 PoorAdvanced section loss, deterioration, spalling or scour.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67 US tons
Inventory rating40 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length40 ft (12.2 m)
Longest span39 ft (11.9 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75 (2022)
Projected traffic120 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$470,000
NavigationNo navigation control on waterway

Frequently asked questions

When was E0960 (ne 150) over Creek built?

It was built in 2003, making it 22 years old in 2025.

What condition is E0960 (ne 150) over Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does E0960 (ne 150) over Creek carry?

About 75 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is E0960 (ne 150) over Creek?

The structure is 40 ft (12.2 m) long with a longest span of 39 ft (11.9 m) and a deck 28 ft wide.

Who owns E0960 (ne 150) over Creek?

It is owned by the City or Municipal Highway Agency.