US Bridges

E0950 (ne 164th) over Creek

Good

Oklahoma County, Oklahoma · 1E of Hiwassee on 164th · Structure no. 243670000000000

Built
1996
29 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
82 ft
1 main span
Daily traffic
100
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

E0950 (ne 164th) over Creek is a prestressed concrete stringer/multi-beam or girder carrying E0950 (ne 164th) over Creek in Oklahoma County, Oklahoma. It was built in 1996, so it is 29 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 5% of them trucks, projected to reach 160 by 2042. The structure is 82 ft (25 m) long and 34 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesE0950 (ne 164th)
CrossesCreek
Location1E of Hiwassee on 164th
RouteCity Street E0950
Coordinates35.63804, -97.2823
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating86.8 US tons
Inventory rating42.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length82 ft (25 m)
Longest span80 ft (24.4 m)
Deck width34 ft (10.5 m)
Roadway width33 ft (10 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2022)
Projected traffic160 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$457,000
NavigationNo navigation control on waterway

Frequently asked questions

When was E0950 (ne 164th) over Creek built?

It was built in 1996, making it 29 years old in 2025.

What condition is E0950 (ne 164th) over Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does E0950 (ne 164th) over Creek carry?

About 100 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is E0950 (ne 164th) over Creek?

The structure is 82 ft (25 m) long with a longest span of 80 ft (24.4 m) and a deck 34 ft wide.

Who owns E0950 (ne 164th) over Creek?

It is owned by the City or Municipal Highway Agency.