SE 36th St. over I-35 under
GoodOklahoma County, Oklahoma · 3.6 MI N Cleveland CO · Structure no. 261260000000000
- Built
- 1999
- 26 years old
- Condition
- Good
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 220 ft
- 2 main spans
- Daily traffic
- 5,000
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SE 36th St. over I-35 under is a steel continuous stringer/multi-beam or girder carrying SE 36th St. over I-35 under in Oklahoma County, Oklahoma. It was built in 1999, so it is 26 years old, younger than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,000 vehicles a day, roughly 7% of them trucks, projected to reach 8,000 by 2042. The structure is 220 ft (67.1 m) long and 64 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SE 36th St. over I-35 under built?
It was built in 1999, making it 26 years old in 2025.
What condition is SE 36th St. over I-35 under in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does SE 36th St. over I-35 under carry?
About 5,000 vehicles per day (2022 count), of which roughly 7% are trucks.
How long is SE 36th St. over I-35 under?
The structure is 220 ft (67.1 m) long with a longest span of 110 ft (33.5 m) and a deck 64 ft wide.
Who owns SE 36th St. over I-35 under?
It is owned by the State Highway Agency.