US Bridges

E1090 (se 29 St) over Creek

Fair

Oklahoma County, Oklahoma · .8E of Sunnylane on SE 29 · Structure no. 184130000000000

Built
1940
85 years old, rebuilt 1973
Condition
Fair
inspected November 2023
Type
Culvert
Concrete
Length
33 ft
3 main spans
Daily traffic
15,000
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

E1090 (se 29 St) over Creek is a concrete culvert carrying E1090 (se 29 St) over Creek in Oklahoma County, Oklahoma. It was built in 1940 and reconstructed in 1973, so it is 85 years old, older than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 15,000 vehicles a day, roughly 5% of them trucks, projected to reach 24,000 by 2042. The structure is 33 ft (10 m) long and 85 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesE1090 (se 29 St)
CrossesCreek
Location.8E of Sunnylane on SE 29
RouteCity Street E1090
Coordinates35.43513, -97.42609
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating41.4 US tons
Inventory rating24.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length33 ft (10 m)
Longest span10 ft (3 m)
Deck width85 ft (25.9 m)
Roadway width64 ft (19.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15,000 (2022)
Projected traffic24,000 by 2042
Trucks5%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$225,000
NavigationNo navigation control on waterway

Frequently asked questions

When was E1090 (se 29 St) over Creek built?

It was built in 1940, making it 85 years old in 2025. It was reconstructed in 1973.

What condition is E1090 (se 29 St) over Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does E1090 (se 29 St) over Creek carry?

About 15,000 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is E1090 (se 29 St) over Creek?

The structure is 33 ft (10 m) long with a longest span of 10 ft (3 m) and a deck 85 ft wide.

Who owns E1090 (se 29 St) over Creek?

It is owned by the City or Municipal Highway Agency.