US Bridges

N3130 (sooner Rd) over Crutcho Creek

Fair

Oklahoma County, Oklahoma · .5N SE 29th on Sooner RD · Structure no. 213240000000000

Built
1986
39 years old
Condition
Fair
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
180 ft
3 main spans
Daily traffic
10,000
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

N3130 (sooner Rd) over Crutcho Creek is a prestressed concrete stringer/multi-beam or girder carrying N3130 (sooner Rd) over Crutcho Creek in Oklahoma County, Oklahoma. It was built in 1986, so it is 39 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 10,000 vehicles a day, roughly 5% of them trucks, projected to reach 16,000 by 2042. The structure is 180 ft (54.9 m) long and 60 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesN3130 (sooner Rd)
CrossesCrutcho Creek
Location.5N SE 29th on Sooner RD
RouteCity Street N3130
Coordinates35.44411, -97.42371
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating41.4 US tons
Inventory rating24.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length180 ft (54.9 m)
Longest span80 ft (24.4 m)
Deck width60 ft (18.3 m)
Roadway width50 ft (15.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,000 (2022)
Projected traffic16,000 by 2042
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.4 million
NavigationNo navigation control on waterway

Frequently asked questions

When was N3130 (sooner Rd) over Crutcho Creek built?

It was built in 1986, making it 39 years old in 2025.

What condition is N3130 (sooner Rd) over Crutcho Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does N3130 (sooner Rd) over Crutcho Creek carry?

About 10,000 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is N3130 (sooner Rd) over Crutcho Creek?

The structure is 180 ft (54.9 m) long with a longest span of 80 ft (24.4 m) and a deck 60 ft wide.

Who owns N3130 (sooner Rd) over Crutcho Creek?

It is owned by the City or Municipal Highway Agency.