S.H. 7 over Guy Sandy Creek
GoodMurray County, Oklahoma · 4.9 E U.S. 77 · Structure no. 321260000000000
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 250 ft
- 3 main spans
- Daily traffic
- 5,200
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
S.H. 7 over Guy Sandy Creek is a prestressed concrete stringer/multi-beam or girder carrying S.H. 7 over Guy Sandy Creek in Murray County, Oklahoma. It was built in 2022, so it is 3 years old, younger than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,200 vehicles a day, roughly 25% of them trucks, projected to reach 256 by 2042. The structure is 250 ft (76.2 m) long and 41 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S.H. 7 over Guy Sandy Creek built?
It was built in 2022, making it 3 years old in 2025.
What condition is S.H. 7 over Guy Sandy Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does S.H. 7 over Guy Sandy Creek carry?
About 5,200 vehicles per day (2022 count), of which roughly 25% are trucks.
How long is S.H. 7 over Guy Sandy Creek?
The structure is 250 ft (76.2 m) long with a longest span of 100 ft (30.5 m) and a deck 41 ft wide.
Who owns S.H. 7 over Guy Sandy Creek?
It is owned by the State Highway Agency.