S. 145th W. Ave over Turner Tp (I-44) under
GoodCreek County, Oklahoma · 79.2 NE JCT I-35 · Structure no. 318590000000000
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 244 ft
- 4 main spans
- Daily traffic
- 50
- 2022 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
S. 145th W. Ave over Turner Tp (I-44) under is a prestressed concrete stringer/multi-beam or girder carrying S. 145th W. Ave over Turner Tp (I-44) under in Creek County, Oklahoma. It was built in 2018, so it is 7 years old, younger than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 50 vehicles a day, roughly 7% of them trucks, projected to reach 80 by 2042. The structure is 244 ft (74.4 m) long and 28 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S. 145th W. Ave over Turner Tp (I-44) under built?
It was built in 2018, making it 7 years old in 2025.
What condition is S. 145th W. Ave over Turner Tp (I-44) under in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does S. 145th W. Ave over Turner Tp (I-44) under carry?
About 50 vehicles per day (2022 count), of which roughly 7% are trucks.
How long is S. 145th W. Ave over Turner Tp (I-44) under?
The structure is 244 ft (74.4 m) long with a longest span of 80 ft (24.4 m) and a deck 28 ft wide.
Who owns S. 145th W. Ave over Turner Tp (I-44) under?
It is owned by the State Toll Authority.