E1890 Snow RD over Fronterhouse Creek
GoodAtoka County, Oklahoma · 1.5E 2.8N of Caney · Structure no. 245320000000000
- Built
- 1996
- 29 years old
- Condition
- Good
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 51 ft
- 1 main span
- Daily traffic
- 50
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
E1890 Snow RD over Fronterhouse Creek is a prestressed concrete stringer/multi-beam or girder carrying E1890 Snow RD over Fronterhouse Creek in Atoka County, Oklahoma. It was built in 1996, so it is 29 years old, younger than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 50 vehicles a day, roughly 10% of them trucks, projected to reach 80 by 2042. The structure is 51 ft (15.4 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E1890 Snow RD over Fronterhouse Creek built?
It was built in 1996, making it 29 years old in 2025.
What condition is E1890 Snow RD over Fronterhouse Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does E1890 Snow RD over Fronterhouse Creek carry?
About 50 vehicles per day (2022 count), of which roughly 10% are trucks.
How long is E1890 Snow RD over Fronterhouse Creek?
The structure is 51 ft (15.4 m) long with a longest span of 46 ft (14 m) and a deck 28 ft wide.
Who owns E1890 Snow RD over Fronterhouse Creek?
It is owned by the County Highway Agency.