US Bridges

U.S. 69 over Clear Boggy Creek Oflow

Good

Atoka County, Oklahoma · 7.49 N Bryan C/L · Structure no. 197870000000000

Built
1980
45 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
126 ft
3 main spans
Daily traffic
8,900
2022 count
Owner
State
State Highway Agency

About this bridge

U.S. 69 over Clear Boggy Creek Oflow is a prestressed concrete stringer/multi-beam or girder carrying U.S. 69 over Clear Boggy Creek Oflow in Atoka County, Oklahoma. It was built in 1980, so it is 45 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,900 vehicles a day, roughly 29% of them trucks, projected to reach 14,240 by 2042. The structure is 126 ft (38.4 m) long and 44 ft wide.

CarriesU.S. 69
CrossesClear Boggy Creek Oflow
Location7.49 N Bryan C/L
RouteU.S. Route 69
Coordinates34.25793, -96.21236
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65.6 US tons
Inventory rating39.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length126 ft (38.4 m)
Longest span42 ft (12.8 m)
Deck width44 ft (13.3 m)
Roadway width41 ft (12.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,900 (2022)
Projected traffic14,240 by 2042
Trucks29%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.7 million
NavigationNo navigation control on waterway

Frequently asked questions

When was U.S. 69 over Clear Boggy Creek Oflow built?

It was built in 1980, making it 45 years old in 2025.

What condition is U.S. 69 over Clear Boggy Creek Oflow in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does U.S. 69 over Clear Boggy Creek Oflow carry?

About 8,900 vehicles per day (2022 count), of which roughly 29% are trucks.

How long is U.S. 69 over Clear Boggy Creek Oflow?

The structure is 126 ft (38.4 m) long with a longest span of 42 ft (12.8 m) and a deck 44 ft wide.

Who owns U.S. 69 over Clear Boggy Creek Oflow?

It is owned by the State Highway Agency.