Maplewood Road over Jksn Cut-Off Maplewood R
FairWood County, Ohio · 0.50 Ml E of Custar RD · Structure no. 8736111
- Built
- 1989
- 36 years old, rebuilt 2000
- Condition
- Fair
- inspected August 2024
- Type
- Truss - Thru
- Steel
- Length
- 104 ft
- 1 main span
- Daily traffic
- 22
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Maplewood Road over Jksn Cut-Off Maplewood R is a steel truss - thru carrying Maplewood Road over Jksn Cut-Off Maplewood R in Wood County, Ohio. It was built in 1989 and reconstructed in 2000, so it is 36 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 22 vehicles a day, roughly 9% of them trucks, projected to reach 31 by 2035. The structure is 104 ft (31.7 m) long and 31 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Maplewood Road over Jksn Cut-Off Maplewood R built?
It was built in 1989, making it 36 years old in 2025. It was reconstructed in 2000.
What condition is Maplewood Road over Jksn Cut-Off Maplewood R in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Maplewood Road over Jksn Cut-Off Maplewood R carry?
About 22 vehicles per day (2015 count), of which roughly 9% are trucks.
How long is Maplewood Road over Jksn Cut-Off Maplewood R?
The structure is 104 ft (31.7 m) long with a longest span of 100 ft (30.5 m) and a deck 31 ft wide.
Who owns Maplewood Road over Jksn Cut-Off Maplewood R?
It is owned by the County Highway Agency.