US Bridges

Ir 75 over CSX RR

Good

Wood County, Ohio · 0.45 Mi. N. Wales Rd. · Structure no. 8704955

Built
2021
4 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
319 ft
3 main spans
Daily traffic
48,055
2018 count
Owner
State
State Highway Agency

About this bridge

Ir 75 over CSX RR is a prestressed concrete continuous stringer/multi-beam or girder carrying Ir 75 over CSX RR in Wood County, Ohio. It was built in 2021, so it is 4 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 48,055 vehicles a day, roughly 22% of them trucks, projected to reach 56,310 by 2038. The structure is 319 ft (97.2 m) long and 78 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIr 75
CrossesCSX RR
Location0.45 Mi. N. Wales Rd.
RouteInterstate 75
StateOhio
Coordinates41.61529, -83.54054
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating89.3 US tons
Inventory rating46.4 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length319 ft (97.2 m)
Longest span110 ft (33.5 m)
Deck width78 ft (23.7 m)
Roadway width74 ft (22.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic48,055 (2018)
Projected traffic56,310 by 2038
Trucks22%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesRailroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ir 75 over CSX RR built?

It was built in 2021, making it 4 years old in 2025.

What condition is Ir 75 over CSX RR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Ir 75 over CSX RR carry?

About 48,055 vehicles per day (2018 count), of which roughly 22% are trucks.

How long is Ir 75 over CSX RR?

The structure is 319 ft (97.2 m) long with a longest span of 110 ft (33.5 m) and a deck 78 ft wide.

Who owns Ir 75 over CSX RR?

It is owned by the State Highway Agency.