US Bridges

Ir 75 over SR 65

Good

Lucas County, Ohio · 750 Ft. S. of Maumee Riv. · Structure no. 4802706

Built
2021
4 years old
Condition
Good
inspected January 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
191 ft
3 main spans
Daily traffic
84,250
2018 count
Owner
State
State Highway Agency

About this bridge

Ir 75 over SR 65 is a prestressed concrete stringer/multi-beam or girder carrying Ir 75 over SR 65 in Lucas County, Ohio. It was built in 2021, so it is 4 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 84,250 vehicles a day, roughly 21% of them trucks, projected to reach 99,790 by 2038. The structure is 191 ft (58.1 m) long and 127 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIr 75
CrossesSR 65
Location750 Ft. S. of Maumee Riv.
RouteInterstate 75
StateOhio
Coordinates41.62026, -83.54119
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.7 US tons
Inventory rating46.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length191 ft (58.1 m)
Longest span85 ft (26 m)
Deck width127 ft (38.8 m)
Roadway width124 ft (37.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic84,250 (2018)
Projected traffic99,790 by 2038
Trucks21%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ir 75 over SR 65 built?

It was built in 2021, making it 4 years old in 2025.

What condition is Ir 75 over SR 65 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Ir 75 over SR 65 carry?

About 84,250 vehicles per day (2018 count), of which roughly 21% are trucks.

How long is Ir 75 over SR 65?

The structure is 191 ft (58.1 m) long with a longest span of 85 ft (26 m) and a deck 127 ft wide.

Who owns Ir 75 over SR 65?

It is owned by the State Highway Agency.