SR 15/USR 20A over Tpk Ramp U SR15 20A
GoodWilliams County, Ohio · 0.2MI West of Exit 13 · Structure no. 8601232
- Built
- 1954
- 71 years old, rebuilt 1990
- Condition
- Good
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 104 ft
- 3 main spans
- Daily traffic
- 6,967
- 2018 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
SR 15/USR 20A over Tpk Ramp U SR15 20A is a steel continuous stringer/multi-beam or girder carrying SR 15/USR 20A over Tpk Ramp U SR15 20A in Williams County, Ohio. It was built in 1954 and reconstructed in 1990, so it is 71 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,967 vehicles a day, roughly 13% of them trucks, projected to reach 9,670 by 2038. The structure is 104 ft (31.7 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 15/USR 20A over Tpk Ramp U SR15 20A built?
It was built in 1954, making it 71 years old in 2025. It was reconstructed in 1990.
What condition is SR 15/USR 20A over Tpk Ramp U SR15 20A in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does SR 15/USR 20A over Tpk Ramp U SR15 20A carry?
About 6,967 vehicles per day (2018 count), of which roughly 13% are trucks.
How long is SR 15/USR 20A over Tpk Ramp U SR15 20A?
The structure is 104 ft (31.7 m) long with a longest span of 42 ft (12.8 m) and a deck 46 ft wide.
Who owns SR 15/USR 20A over Tpk Ramp U SR15 20A?
It is owned by the State Toll Authority.