Twp Road 3 over Melvin Richey Ditch
FairPosted for loadWayne County, Ohio · 0.4 Mi. E. of CR16 · Structure no. 8537526
- Built
- 1936
- 89 years old, rebuilt 2000
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 27 ft
- 1 main span
- Daily traffic
- 341
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Twp Road 3 over Melvin Richey Ditch is a steel stringer/multi-beam or girder carrying Twp Road 3 over Melvin Richey Ditch in Wayne County, Ohio. It was built in 1936 and reconstructed in 2000, so it is 89 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 341 vehicles a day, roughly 8% of them trucks, projected to reach 473 by 2035. The structure is 27 ft (8.2 m) long and 20 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Twp Road 3 over Melvin Richey Ditch built?
It was built in 1936, making it 89 years old in 2025. It was reconstructed in 2000.
What condition is Twp Road 3 over Melvin Richey Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Twp Road 3 over Melvin Richey Ditch carry?
About 341 vehicles per day (2015 count), of which roughly 8% are trucks.
How long is Twp Road 3 over Melvin Richey Ditch?
The structure is 27 ft (8.2 m) long with a longest span of 26 ft (8 m) and a deck 20 ft wide.
Who owns Twp Road 3 over Melvin Richey Ditch?
It is owned by the County Highway Agency.