US Bridges

SR 226 over Over Shreve Run

Good

Wayne County, Ohio · 0.98 Mi.N.Of Holmes CO LN · Structure no. 8504318

Built
2009
16 years old
Condition
Good
inspected November 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
46 ft
1 main span
Daily traffic
2,626
2015 count
Owner
State
State Highway Agency

About this bridge

SR 226 over Over Shreve Run is a prestressed concrete box beam or girders - multiple carrying SR 226 over Over Shreve Run in Wayne County, Ohio. It was built in 2009, so it is 16 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,626 vehicles a day, roughly 4% of them trucks, projected to reach 3,645 by 2035. The structure is 46 ft (14.1 m) long and 32 ft wide.

CarriesSR 226
CrossesOver Shreve Run
Location0.98 Mi.N.Of Holmes CO LN
RouteState Highway 226
StateOhio
Coordinates40.67808, -82.0293
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating55.3 US tons
Inventory rating42.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length46 ft (14.1 m)
Longest span45 ft (13.7 m)
Deck width32 ft (9.8 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,626 (2015)
Projected traffic3,645 by 2035
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 226 over Over Shreve Run built?

It was built in 2009, making it 16 years old in 2025.

What condition is SR 226 over Over Shreve Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does SR 226 over Over Shreve Run carry?

About 2,626 vehicles per day (2015 count), of which roughly 4% are trucks.

How long is SR 226 over Over Shreve Run?

The structure is 46 ft (14.1 m) long with a longest span of 45 ft (13.7 m) and a deck 32 ft wide.

Who owns SR 226 over Over Shreve Run?

It is owned by the State Highway Agency.